Sharpe Edge features news, views and analysis from our team of specialist local government lawyers working at the heart of the latest legal developments. Sharpe Edge platform is also the only place where local government lawyers can get e-access to two law books by our Head of Local Government Rob Hann: The Guide to Local Authority Charging and Trading Powers (‘LACAT’) and The Guide to Local Authority Companies and Partnerships (‘LACAP’).

 

                                                                                                  

Slide background

When procurement law and contracts for interests in land meet

Icons CourtColin Ricciardiello provides a case law update examining cases that have examined the overlap between a requirement to procure and a contract for the disposal of an interest in land.

There ought to be no procurement issue when these two elements come together in cases where one of the parties is a contracting authority within the meaning of The Public Contracts Regulations 2015 (“PCR”) as the PCR does not apply to contracts for interests in land. The PCR applies to “public contracts” which are defined as “… contracts for pecuniary interest concluded in writing between one or more economic operators and one or more contracting authorities and having as their objective the execution of works, the supply of products or the provision of services”.

Equally, the position should be straightforward under the Concession Contracts Regulations 2016 (“CCR”) as there is a specific exemption in Regulation 10(11) (a) which states that the CCR does not apply to services concession contracts for: “the acquisition or rental, by whatever financial means, of land, existing buildings or other immovable property or which concern interests in or rights over any of them”.

The issue that has arisen is in cases where the contract for disposal of land is also part of a wider development agreement under which the transferred interest may also be a “public works contract”, being contracts which have as their object the execution of works/design and which currently exceed £4.7m.  Those activities are set out in Schedule 2 of the PCR and include construction of new buildings, restoration works and common repairs.

Similarly, under the CCR there may be an overlap if the land transaction also amounts to: a “works concession contract” – being one for a pecuniary interest that entrusts the execution of works in  consideration of the right to exploit the works or; a “services concession contract” – namely a contract for a pecuniary interest under which the contracting authority entrusts the provision and management of services (other than for works), the consideration for which is the right to exploit the services provided under the contract.

There have been a number of cases which have examined the overlap between a requirement to procure and a contract for the disposal of an interest in land. The purpose of this article is to examine some of the more recent prominent cases.

Faraday Developments Ltd v West Berkshire Council[1]

Here, the contract was a development agreement which involved disposal of a development site. The Council went through a S.123[2] process (but not a procedure as if it was a public works contract). As a result, a development agreement was made with St Modwen Developments Ltd.

The Council decided that the agreement was not a public works contract but was alive to the issue and so published a precautionary VEAT notice[3].  In that notice the Council described the object of the agreement as “an exempt land transaction”.

The agreement gave St Modwen the option to draw down parcels of land by giving notice to take a grant of a long lease or transfer of the freehold.  If it chose not to do either, it was under no obligation to execute any works. However, if it did then service of that notice constituted a binding contract for the grant or sale and on completion it was obliged to build and develop.  The Court of Appeal decided that it was necessary to look at the arrangements as a whole and their commercial substance. From that perspective the agreement was not a public works contract when it was entered into because St Modwen was not under an immediate enforceable obligation to undertake works, it would though become obliged once the option to draw down was exercised.  Therefore, on entering into the agreement, the Council “… had committed itself contractually, without any further steps being required of it, to a transaction that will fully satisfy the requirements of a “public works contract”. It had committed itself to procuring the development from St Modwen” (paragraph 61).  Entering into the agreement was held to be an actual and anticipatory breach of the PCR and a breach of public law as it meant that the Council had agreed to act unlawfully in the future by not holding a procurement after the option was exercised.

At first it does not appear that Faraday sits too well with the Section 106[4] agreement considered in R (Midlands Co-op) v Birmingham City Council[5].  Both involved contingent developer obligations.  However, the Court in Faraday distinguished the cases by holding that the Section 106 agreement in Birmingham was very different to the Faraday private law contractual development obligation.  Section 106 agreements have a distinct status and role in the statutory planning scheme for regulating the development of land for which planning permission is granted.  Also, the Council in Birmingham was not trying to commission the works but mitigating the effects of the development if it was undertaken and, in so doing, it was discharging its regulatory (and statutory) planning function, not embarking on contractual arrangements for development of its land.

AEW Europe LLP v Basingstoke & Deane Borough Council & NewRiver Leisure Ltd[6]

In this case the Council did carry out a procurement procedure to redevelop and regenerate a leisure park. Only two economic operators submitted initial tenders. The successful one ultimately offered a more detailed tender and following negotiations (and post the final tender stage) a development agreement was signed which contemplated a bolder regeneration and increased retail element than envisaged at the procurement stage.

The Claimant, AEW, did not participate in the procurement. It had bought nearby retail investment properties and had a commercial interest in preventing the Council’s retail development.  AEW sought to declare the development agreement ineffective as it so radically departed from the contract sought in the procurement and required a fresh procurement.  As an aside, there was a live but undetermined issue as to whether AEW had standing to bring a claim at all – no duty could be owed to an economic operator who did not participate in the procurement[7].

Comparing the OJEU original notice and the development agreement, the court held that they were sufficiently related so the notice was effective and sparked a competition.  On that basis the claim for a declaration of ineffectiveness for failing to advertise the procurement failed.

European Commission v Republic of Austria[8]

The issue here was whether a contracting authority’s taking of a long-term lease amounted to a public works contract which should have been the subject of a competitive procedure.  That was based on the definition of a works contract which extends to cases where the works correspond to the requirements specified by the contracting authority who exercises decisive influence on the type or design of the work. That element of control also featured in Faraday.

It was held that the lease was not a public works contract because:

  1. the lease provided for the option of letting additional space, not the construction of that space. That option did not have a decisive influence on the design;
  2. the design of additional floors and connecting bridges was envisaged in plans which existed before the lease negotiations – and so the Authority could not have exercised a decisive influence on that pre-existing aspect of the design;
  3. in order to be of decisive influence, it would be necessary to influence the architectural structure e.g. size/external walls; or its specifications for the interior were very specific and detailed requirements.  If not, then the influence is unlikely to be decisive;
  4. the conclusion of a long lease was not unusual, and it was normal for a tenant to makes its specification wishes clear in respect of new build or an upgrade in cases where a tenant changes; and
  5. overall, the Authority’s stipulations did not exceed what a tenant normally requires.

Peters v London Borough of Haringey & Lendlease Europe Holdings Ltd[9]

In this important ruling, it was confirmed that LLP structures (rather than a company) can be used to create joint venture vehicles with private sector entities to undertake regeneration projects.

Whilst not the only regeneration power available to the Council, a point in issue was that the general power of competence under The Localism Act 2011 was subject to Section 4(2) of that Act so that where a local authority does things for a commercial purpose it must do them through a company and so (it was argued) that excluded an LLP structure.

Here it was held that: the commercial purpose of money making was not the Authority’s dominant purpose – those purposes included the best/only means to use the Council’s land and buildings to achieve regeneration (not commercial property development), job creation and newly built houses. In particular: the relevant purpose was that of the Council not the LLP or its private sector partner.  That was an important finding as the definition of an LLP includes an entity who has the objective of making a profit; mere profit making did not in itself equal a commercial purpose; if there were separate purposes, then the company only requirement under Section 4(2) would apply where the dominant purpose was a commercial one.

Ocean Outdoor v London Borough of Hammersmith[10]

This was the first case on the CCR and concerned the Council’s decision to enter a lease for two plots of land it owned and the operation of two advertising screens.

The Council sought competitive bids for new leases of the plots and the winner’s bid offered much higher rent than the Claimant’s bid. Ocean argued that the grant of the leases were a “Services Concession Contracts” which should been the subject of a procedure under the CCR.

The Court of Appeal held that, in line with established EU case law, “Services” are those which otherwise would have to be provided by the Authority as part of its statutory obligations or furtherance of its strategic objectives. The Authority had no statutory obligation to provide advertising services and they were not provided on the Authority’s behalf; it is for the challenger to prove that the procurement rules apply and not for the Authority to displace an assumption that they do; the paradigm concession contract will involve third party members of the public for whom the Authority is obliged to provide services.  Here the third parties were the advertisers who had no connection with the Authority and the money they paid to the Authority Tenant had nothing to do with the Council who had a separate entitlement to rent unrelated to the advertising revenue received by the tenant.

Importantly, the Regulation 10(1)(a) land exemption was held to be applicable – the leases were genuine and not contracts to provide advertising services; they granted exclusive possession; a fixed rent was paid and was not conditional on or affected by a type or level of advertising sold by the Tenant.

Conclusions

When it comes to development agreements, since Faraday it seems clear that: deferred or contingent development obligations in themselves will not prevent such an agreement from being a public works contract; whilst the PCR applies, the protection offered by a VEAT notice will not necessarily be secured if the notice lacks the required detail[11] as occurred in Faraday.  A consequence which led to the first declaration of ineffectiveness ever made in the UK.

The Republic of Austria decision usefully illustrates and alerts to the possibility of over specified, and perhaps out of the ordinary, Buyer/Tenant requirements leading to the unintended creation of a public works contract.

Peters and Haringey serves to illustrate how the more flexible and greater control offered by an LLP structure is permissible in the regeneration area but if that is the vehicle chosen, then it would be prudent to have a detailed internal account of the public body’s regeneration purpose in order to show that regeneration was not predominantly for commercial reasons.

It seems clear that even if the rent payable in Ocean was a turnover one, the land exemption would still apply.

Post Brexit, even after the current procurement regime is replaced as anticipated, the requirement to tender for the equivalent of public works contracts will remain.  With that in mind, and the emphasis on public authorities to regenerate through development agreements and otherwise (in order to and make the most of their land holdings), the principles in these key cases are likely to remain relevant.

Colin Ricciardiello is a Partner at Sharpe Pritchard.


[1] Court of Appeal [2018] EWCA Civ 2532

[2] Section 123 of The Local Government Act 1972 under which there is a duty on the Authority to achieve the best price reasonably obtainable when disposing of an interest in land.

[3] A voluntary ex ante notice under Regulation 99 (3) of the PCR. If the VEAT procedure is complied with then that should disapply the first ground of ineffectiveness, being the most obvious “penalty” for directly awarding a contract in breach of the PCR.

[4] Section 106 of The Town & Country Planning Act 1990.

[5] [2012] EWHC 620 (Admin) where Tesco agreed to replace/rebuild community facilities if its proposed redevelopment caused the existing facilities to be lost. The Court held that this was not an enforceable contractual obligation as it was up to Tesco to decide on whether it should redevelop and if it did not then there was no obligation to replace/rebuild.

[6] [2019] EWHC 2050 (TCC)

[7] In Royal Cornwall Hospitals NHS Trust v. Cornwall Council [2019] EWHC 2211 the court decided no duties were owed to an economic operator who did not participate in a procurement and, in consequence, was unbale to show that it suffered or risked suffering any actionable loss as required by Regulation 91 of the PCR.

[8] (Case C-537 /19).  See also a link to a more detailed article on this decision.

[9] [2018] EWHC 192

[10] [2019] EWCA Civ 1642.

[11] The emphasis on the exempt land transaction element in the VEAT notice was held to be “….  more than mere over-simplification. It was incorrect, or at best misleading. The development agreement extends considerably further than a transaction for the disposal or transfer of land. It contains intricate provisions for the design and execution of a large development, which it was envisaged and intended that St Modwen would carry out”.


For further insight and resources on local government legal issues from Sharpe Pritchard, please visit the SharpeEdge page by clicking on the banner below.

sharpe edge 600x100

This article is for general awareness only and does not constitute legal or professional advice. The law may have changed since this page was first published. If you would like further advice and assistance in relation to any issue raised in this article, please contact us by telephone or email This email address is being protected from spambots. You need JavaScript enabled to view it.

LACAT BookFREE download!

A Guide to Local Authority Charging and Trading Powers

Written and edited by Sharpe Pritchard’s Head of Local Government, Rob Hann,

A Guide to Local Authority Charging and Trading Powers covers:

• Updated charging powers compendium          • Commercial trading options

• Teckal ‘public to public’                                    • Localism Act

FREE DOWNLOAD

LACAT BookAvailable to buy:

A Guide to Local Authority Companies and Partnerships

An invaluable, comprehensive toolkit for lawyers, law firms and others advising
on or participating in Local Authority Companies and Partnerships”

- Local Authority Chief Executive

BUY NOW

  More Articles

<a href=

Environment Act 2021: What Does it Mean for Waste Authorities?

Sally Stock, Juli Lau, Ellen Painter and Beth Edwards discuss notable changes made to the Environment Bill 2021-2022, which received Royal Assent on the 9th November.
<a href=

ESG and its relevance to the public sector

Peter Collins and Sydney Chandler discuss the growing importance of Environmental, Social, and Governance criteria in public procurement.
<a href=

JCT 101: Time and Punishment

Rachel Murray-Smith, Clare Mendelle and Laura Campbell discuss a common Construction scenario regarding the Practical Completion of a project, and the position under the unamended JCT DB 2016.
Icons Court

The importance of due process, communication and fairness in employee conduct investigations – what you need to know.

Julie Bann and James Hughes discuss the importance of fairness in employee conduct investigations, taking a look at the London Borough of Hammersmith and Fulham -v- Mr S Keable case.
<a href=

Becoming More Inclusive: VAT and the Public Procurement (Agreement on Government Procurement) (Thresholds) (Amendment) Regulations 2021

Juli Lau, Natasha Barlow and Beth Edwards examine the recently published Public Procurement Regulations 2021, focussing upon amendments to the thresholds within various procurement regimes.
<a href=

The LADs are Alright

Laura Campbell discusses liquidated damages in construction contracts, focussing upon the long-running Triple Point saga which ended in the Supreme Court this year.
<a href=

Procurement Policy Note 08/21

Juli Lau and Beth Edwards outline Procurement Policy Note 08/21, recently published by the Cabinet office.
Icons Court

Hard Times: Improving Air Quality with Clean Air Zones

Rob Hann and James Goldthorpe examine the introduction of Clean Air Zones to improve air quality across the UK.
<a href=

Autumn Budget Spending Review 2021 – What Public Bodies Need To Know

Rob Hann and James Hughes examine the Autumn Budget Spending Review 2021, looking at what Public Bodies need to know.
<a href=

Net Zero – What’s new for local authorities?

Steve Gummer and Sophie Drysdale look at two major climate publications: the Heat and Buildings Strategy and the Net Zero Strategy.
Icons Hazard

Jumping to conclusions: Final Statements, liquidated damages and material breaches of natural justice

Michael Comba looks at a recent Technology and Construction Court case that provides useful guidance on the JCT’s procedural requirements on disputing Final Statements.
Icons Court

Three times one equals one: Several disputed payment applications amount to a single dispute

Michael Comba considers a case in which the High Court dismissed an employer’s argument that an adjudicator lacked jurisdiction because the referral concerned three separate payment applications and, therefore, comprised three separate disputes.
<a href=

Warm feelings or hot air: the Heat and Buildings Strategy and Heat Networks

This week the government published its Heat and Buildings Strategy (Strategy). This contained vital innovations and essential step changes in terms of how heating is provided, writes Steve Gummer.
<a href=

Procurement reforms: update from Cabinet Office

Rob Hann, Nicola Sumner and Juli Lau assess the Cabinet Office's update on the progress of the government's public procurement reforms.
Icons Court

Bond, Performance Bond. Delivering value for the Public Sector?

Justin Mendelle examines whether public sector clients achieve value for money from the provision of performance bonds.
Icons Hazard

Not so personal messages: R. (on the application of Good Law Project Ltd) v Secretary of State for Health and Social Care and Abingdon Health Plc [2021] EWHC 2595 (TCC)

Nicola Sumner, Juli Lau and Beth Edwards look at The Good Law Project's challenge of the direct award by the Secretary of State for Health and Social Care of three contracts for the production and supply of rapid Covid-19 antibody tests (the “Contracts”).
<a href=

Insolvency – Termination and Beyond

Rachel Murray-Smith and Clare Mendelle consider the potential warning signs of, and the compliant manner for dealing with, contractor insolvency.
Icons Court

Settlement agreements – waiving Personal Injury claims

In the case of Farnham-Oliver v RM Educational Resources LTD, the Queen’s Bench Division of the High Court allowed a Personal Injury claim (“PI claim”) to be pursued by an employee against his former employer despite the parties signing a Settlement Agreement in respect of an Employment Tribunal claim on the same issue. Julie Bann and James Hughes report.
Icons Hazard

Mandatory Vaccination for Care Home Workers in England – Update

Rachel Murray-Smith and Francesca Gallagher look at the detail of the government's guidance on compulsory vaccination for care staff.
<a href=

Make your mind up! Liquidated Damages clause upheld despite Employer’s challenge

In the recent case of Eco World Ballymore (EWB) v Dobler[1] , an Employer took the unusual position of challenging their own entitlement to liquidated damages (LDs) on the ground that the LDs provision constituted an unenforceable penalty clause. Clare Mendelle and James Goldthorpe investigate.
<a href=

Are Collateral Warranties Construction Contracts? Timing is Key.

Clare Mendelle and Anna Sidebottom examine the recently decided case of Toppan v Simply[1], which has provided guidance on when collateral warranties may be considered “construction contracts” under the Housing Grants, Construction and Regeneration Act 1996 and so give the warranty holder the right to adjudicate.
Icons Court

Climate emergency or climate catastrophe?

Rob Hann asks how central & local government departments and councils can work together more effectively to combat the challenges to achieve net zero by 2050.
Icons Court

Big Problems Need Radical Solutions – Time to Play Monopoly with District Heating?

Steve Gummer examines how local authorities might make district heat networks a reality.
<a href=

The Judicial Review and Courts Bill

The Judicial Review and Courts Bill was introduced to the House last week on 21 July 2021. William Rose and Anna Sidebottom discuss the potential impact of the bill.
<a href=

Liquidated damages and termination

Clare Mendelle, Francesca Gallagher and James Goldthorpe provide an outline of the Supreme Court's recent decision in Triple Point Technology vs PTT Public Company Limited.

Mandatory Vaccination for Care Home Workers in England

The Government has announced that people working in care homes in England must be fully vaccinated against Covid-19 from October 2021, unless they have a medical exemption, write Rachel Murray-Smith and Francesca Gallagher.
Icons Court

Transparency in Procurement: Procurement Policy Note (“PPN”) 07/21

Julie Lau, Clare Mendelle and Beth Edwards outline the new regime for publishing procurement notices post-Brexit
Icons Court

When procurement law and contracts for interests in land meet

Colin Ricciardiello provides a case law update examining cases that have examined the overlap between a requirement to procure and a contract for the disposal of an interest in land.
tb w74 h74 crop int a734a5aec8e0dcb7849ee8ebeb84a53d

UK granted data protection adequacy decision

Charlotte Smith summarises the new data protection adequacy decision.

First Impressions on the New Subsidy Control Bill

Last week the Government published its new Subsidy Control Bill. The Bill represents a significant shift in the way in which subsidies are assessed and also provides some clarity about the regime that will replace the EU State aid regime, writes Peter Collins.
Icons Court

Managing new enforcement powers for councils under the Traffic Management Act 2004

Rob Hann considers the recent legislative changes to traffic management in England, including the introduction of Clean Air Zones and widening local authorities enforcement powers for moving traffic offences.
Icons Court

Implementing Net Zero: Taking account of Carbon Reduction Plans in the Procurement of Major Government Contracts

The Government recently published the Procurement Policy Note 06/21. This will require suppliers bidding for major government contracts to provide a Carbon Reduction Plan at the selection stage and commit to achieving Net Zero by 2050, writes Clare Mendelle and James Goldthorpe.
tb w74 h74 crop int a734a5aec8e0dcb7849ee8ebeb84a53d

Public Procurement Update June 2021

On 3 June 2021, the Government issued the National Procurement Policy Statement (NPPS), and the associated Procurement Policy Note (PPN). George Dale explains what each document does.

What a bind: Section 106 planning obligations where there are multiple land interests

Rachel Lee and Christos Paphiti consider whether the case of R (on the application of McLaren) v Woking Borough Council impacts upon local planning authorities (LPAs) ability to properly consider the land interests and parties as regards to performance of specific obligations.
Icons Court

The use of experts only works when everyone plays by the same rules

Colin Ricciardiello looks at the use of expert witnesses in the wake of an important recent decision.
Icons Court

Unlawful Award of Contract

The High Court has ruled that the Minister for the Cabinet Office, Michael Gove, broke the law by giving a contract to a market research company, Public First, who are run by long-time associates of his. Anna Sidebottom, Francesca Gallagher and Clare Mendelle report.